Unpublished Building 2 Page_Media

Knight Campus Building 2

Photos & Media Resources

Building 2 is part of the second phase of Knight Campus development, a 184,000-square-foot, multi-story bioengineering and applied science research facility. Designed by Portland-based ZGF Architects, it will double the campus’ capacity for research and development of new biomedical technologies with additional room for expanding academic programs, spin spaces to incubate new startup companies and a state-of-the-art new biocharacterization core facility. It will include the second of two Papé Family Innovation Center facilities, offering individual modules that companies can lease, and providing flexibility for different kinds of startup companies.

Overview

The Phil and Penny Knight Campus for Accelerating Scientific Impact is the most dramatic change in the 140-year history of the University of Oregon. While it has unlimited potential for scientific education and societal benefits, its success is also nearly entirely dependent on continued donor, state, federal, and community support. It’s essential that our communications are consistent, accurate, clear, and aligned with the expectations of both current and prospective funders.To ensure this accuracy, all communications materials that reference the Knight Campus are required to be approved by University Communications. To streamline the approvals process, use the recommendations and resources provided in this style guide.


Clearing Your Project

If you’re planning to use Knight Campus assets for event-marketing, editorial or commercial purposes, or are a member of a partner organization creating informational materials, please seek approvals and permission.

  • Seek approval for your project by writing to kccomms@uoregon.edu.
  • Allow a week for approval of all documents, although many requests can be turned around more quickly

Editorial Guidelines

Academic and Professional Citations

Phil and Penny Knight Campus for Accelerating Scientific Impact, University of Oregon, Eugene, OR

References

Spell out the first reference to the Phil and Penny Knight Campus for Accelerating Scientific Impact. In subsequent references, use Knight Campus.

  • First reference: The Phil and Penny Knight Campus for Accelerating Scientific Impact
  • Additional references: Knight Campus
  • Campus references: When referring to the entire campus, use Phil and Penny Knight Campus for Accelerating Scientific Impact or Knight Campus
  • Building references:

First reference to the building at 1505 Franklin Blvd.: Phil and Penny Knight Campus for Accelerating Scientific Impact Building 1 or Knight Campus Building 1 (NOTE: "Building 1 of the Phil and Penny Knight Campus for Accelerating Scientific Impact or Building 1 of the Knight Campus are also acceptable)Additional references: Building 1 First reference to the building at 1100 Riverfront Parkway: Phil and Penny Knight Campus for Accelerating Scientific Impact Building 2 or Knight Campus Building 2 (NOTE: "Building 2 of the Phil and Penny Knight Campus for Accelerating Scientific Impact or Building 2 of the Knight Campus are also acceptable) Additional references: Building 2 Skybridges First reference to the skybridge connecting Knight Campus Building 1 to the Lewis Integrative Science Building: Phil and Penny Knight Campus for Accelerating Scientific Impact Skybridge or Knight Campus Skybridge Additional references: Skybridge First reference to the skybridge connecting Knight Campus Building 1 to Knight Campus Building 2: Phil and Penny Knight Campus for Accelerating Scientific Impact Skybridge 2 or Knight Campus Skybridge 2 Additional references: Skybridge 2

  • General references: Use lower case for general references to the campus, the initiative, the project.

Avoid: Do not shorten Knight Campus to KC. (e.g., KC Building 1)

What It is Not

  • A complex
  • An institute
  • A center
  • A school or college
  • An acronym, such as KCASI

Donor References

Penny and Phil Knight, BBA ’59Follow the naming protocol already in place for donors when referenced in an article or story:

  • Penny and Phil Knight (when referring to a couple, use the woman’s name first)
  • the Knights
  • Mr. and Mrs. Knight

First names, Phil and Penny, are acceptable when used in direct quotes.

Funding

The new campus is made possible by an extraordinary $500 million lead gift from Penny and Phil Knight in 2016, augmented with $70 million in state bonds, and followed up with a second $500 million gift from Penny and Phil Knight in 2021. 

Academic Department

The Knight Campus houses the Department of Bioengineering. In subsequent references, bioengineering or BioE are acceptable.

  • First reference: Department of Bioengineering
  • Additional references: BioE*, bioengineering

*Avoid the use of all caps (e.g., BIOE)

Descriptions

The Phil and Penny Knight Campus for Accelerating Scientific Impact is . . .

  • 10-Word Description: . . . designed to accelerate the cycle of generating impact from discoveries.
  • 25-Word Description: . . . designed to fast-track scientific discoveries into innovations, products, or cures to improve the quality of life for people in Oregon and throughout the world.
  • 50-Word Description: . . . a new campus designed to accelerate the cycle of moving discoveries to impacts for the greater good. Rooted in the UO’s 60-year history of interdisciplinary collaboration, it will train new generations of scientists, forge tighter ties with industry and entrepreneurs, and create new opportunities for graduate and undergraduate students.

Social Media

The Phil and Penny Knight Campus for Accelerating Scientific Impact is on Instagram, LinkedIn, and Bluesky.

Hashtags — The following hashtags are primary

  • #KnightCampus
  • #KnightCampusBioE
  • #AccelerateYourCareer
  • #UOResearch
  • #KCBuilding2Impact

Additional AccountsKnight Campus Graduate Internship Program


Photo Assets

Wooden wall with a black sign with the 'O' and "Phil and Penny Knight Campus For Accelerating Scientific Impact"

South Entrance Sign

Credit

Download

glass and steel exterior of building 2, with blue skies

Exterior

Credit

Download

Interior with Users

Credit

Download

Building 2 News and Events

David Peeler and Peter Chien spoke with local Eugene media about their research and the new facility spaces in Building 2.

The new café opened April 20 and operates Monday to Friday from 7:30 a.m. to 4 p.m. It is designed to be a flexible, comfortable space for students, employees and campus visitors alike.

Riverfront Bistro, the UO's newest dining destination located on the southeast side of Knight Campus Building 2 on Riverfront Parkway, will open to the public on Monday, April 20.